Already tested for Europe and wondering whether you’ll need another EMC test for Australia?
The Australian Communications and Media Authority (ACMA) proposes to recognise more emissions standards harmonised under the EU EMC Directive (2014/30/EU). One aim is to reduce duplicate electromagnetic compatibility (EMC) testing by giving suppliers more ways to demonstrate compliance. ACMA consultation paper
At a glance
· Draft Schedule 8 includes an additional European emissions standard for certain industrial machine tools.
· ACMA proposes to consolidate its EMC rules and update device classification and Regulatory Compliance Mark (RCM) labelling.
· Comments close at 5 pm AEDT on 29 January 2027. The current rules still apply.
Which European EMC reports could be relevant?
Australia already lists EN 55032 for relevant multimedia equipment. The draft lists EN 50370-1:2005 for certain industrial machine tools, adding a proposed option for that product category. Whether an existing report can support Australian compliance depends on the standard and edition applicable to the device, the product configuration covered by the report and any relevant transitional provisions. Current ACMA standards list · Draft Schedule 8, item 10 · Draft transitional provisions · ACMA supplier guidance
How would Australia’s EMC rules change?
ACMA proposes to repeal the Radiocommunications (Electromagnetic Compatibility) Standard 2017 and the Radiocommunications Labelling (Electromagnetic Compatibility) Notice 2017 and move their substantive requirements into the Radiocommunications Equipment (General) Rules 2021. Schedule 3 would cover labelling and compliance records. Schedules 6 to 8 would cover technical requirements, exclusions and recognised standards. ACMA consultation paper
What would change for device classification and RCM labelling?
The draft retains three EMC compliance levels. It would narrow the battery-powered definition to specified battery types and use CISPR 11:2024 to identify Group 2 industrial, scientific and medical equipment for Level 3. Draft amendments, Schedule 3
Certain steps, including supplier registration and the declaration of conformity, could be completed by the time of supply. The device would still have to meet prescribed standards when the RCM is applied. The draft would also allow the relevant manufacturer or importer to publish electronic-label instructions on its website. Draft amendments, sections 22C and 27 and Schedule 3
When could the changes take effect?
The consultation closes at 5 pm AEDT on Friday 29 January 2027. If adopted as drafted, the amendments would take effect the day after registration on the Federal Register of Legislation. The draft also includes transitional provisions for qualifying devices, labels and supplier registrations. ACMA consultation and draft instruments
TESTiLABS view
If Australia is your next market, pull out the emissions report before you book a test slot. The standard and edition, the model you plan to supply and your target launch date are a good starting point for working out what to check. Discuss your project with TESTiLABS
Related TESTiLABS services
EMC and RF Testing · Country Specific Approvals